EO-2022-0215
Consumer Comment No. | Date Filed | Consumer Comments |
---|---|---|
P202300410 | 8/31/2022 3:06 PM | Investigation of Rush Island Generating Facility should include existing boilers switching to natural gas for a interim period. I have managed large boilers and would suspect that these boilers can fire some amount of natural gas and as needed could be modified to fire more natural gas if pipeline gas is available. This is the type of work I did for 30 years and would like to know more about their facility and its design capabilities. |