1 | 4/25/2014 | Revise Tariff |
To allow an inspection by an authority having jurisdiction (AHJ) to occur after June 30th, but no later than July 31st, while allowing the customer to retain the rebate rate of $2.00 per watt.
Tariff Sheet Details:
3rd rs 88.1 replacing 2nd rs 88.1, 2nd rs 88.2 replacing 1st rs 88.2 |
Effective | 5/25/2014 | ||||||||||
Total: 2 file(s), 187.87 KB
|
|||||||||||||||
2 | 5/21/2014 12:06 PM | Commission Order | Order Suspending Tariff | Related Case Filing: | Withdrawn | 8/23/2014 | |||||||||
Total: 2 file(s), 96.84 KB
|
|||||||||||||||
3 | 5/28/2014 4:13 PM | Withdraw Tariff |
To allow an inspection by an authority having jurisdiction (AHJ) to occur after June 30th, but no later than July 31st, while allowing the customer to retain the rebate rate of $2.00 per watt. The amount of time required by the AHJ’s to complete an inspection is, largely, outside of a customer’s control, and allowing the inspection to occur after June 30th is consistent with the Company’s existing solar rebate tariff treatment of the Company’s meter installation.
Tariff Sheet Details:
Complete pending tariff has been withdrawn. |
Withdrew Entire Filing: Yes | Withdrawn | 8/23/2014 | |||||||||
JE-2013-0582 | 6 | Replace Tariff Entirely | Effective | 6/30/2013 |